The Execution Layer

For aerospace operations

Execute shop floor, supply chain, MRO, and compliance-critical operations in real time.
Built for regulated aerospace environments.
Empower your people. Supercharge your data. Accelerate AI.

solution

your operations where work actually happens.

Connect 981 sits between your planning systems and your people. Shop floor, supply chain, MRO, traceability: one execution layer that captures every action as it happens. Your data gets structured, NO ERP replacement and ROI in 4 weeks. Your processes get visible. Your team stays in control.

Problem

Aerospace execution is still held together by spreadsheets and emails.

Between that plan and the shop floor, work moves through email threads, spreadsheets no one owns, and process knowledge that lives in people's heads. When John retires, that knowledge walks out the door. When an auditor shows up, your team scrambles to reconstruct what actually happened.

Daily operations rely on emails, spreadsheets, and memory — increasing risk at every handoff.

📊
Spreadsheet v47_FINAL
Last updated 3 weeks ago
📧
RE: RE: FW: Shortage Update
See my previous email below
📝
John's Process Notes
Ask John… he retired last month
📋
Audit Prep Tracker
"We'll fill this in before the audit"

platform

Your Ops Team Builds It. No Code Required.

Connect 981 uses a visual workflow builder where your team creates small actions called "bricks": collect data, check a condition, send an alert, update a record. Assemble them into complete processes. Change them when the work changes. No IT ticket required.

Design
Assemble
Deploy
Saved
C
Collect
(5)
D
Data
(3)
Calculate
(2)
?
Condition
(1)
M
Message
(1)
!
Alert
(2)
~
Modify Data
(3)
Delete Data
(3)
S
Set Data
(1)
+
Other Types
(2)
Drag to canvas →
Start
C
Collect Work Order
WO-2026-0847 · Assembly Line 3
D
Verify Parts Kit
Cross-ref BOM · 12 items
?
Condition
Parts availability check
1st path
C
Begin Assembly
Log start · Assign operator
Log Completion
Path 2
M
Message
Notify shortage
Notify Procurement
Other cases
~
Modify Data
Update status
Escalate to PM
Preview
AI Agent
Your AI assistant
Helps you design and optimize workflows
Add a shortage handling path when parts are only partially available
I've added a "Partial" branch to your condition with a shortage logging step and procurement notification.
Also flag it as high priority for the PM
Describe what you want to build...
AI Agent

Compliance

Compliance captured during execution, not after.

Every action is timestamped, attributed, and audit-ready the moment it happens. No retroactive paperwork. No scrambling before an audit. Traceability is the byproduct of doing the work.

Built for aerospace standards. Ready for what's next.

Audit Trail
WO-2026-0847 · Assembly Line 3
Live
14:32:08
Work order opened
M. Durand · Station 4A
14:33:41
Parts kit verified — 12/12 items
M. Durand · Scanner #07
14:35:12
FAI signature captured
L. Bernard · Quality Inspector
14:48:30
Assembly step 3 completed
M. Durand · Torque spec logged
14:52:17
Serial genealogy linked
Auto · SN-7842-A → Parent WO
15:01:05
Final inspection sign-off
C. Moreau · Shift Supervisor
15:01:06
Record locked — immutable
System · Compliance seal applied

Knowledge & Resilience

Tribal knowledge captured
inside workflows.

The torque sequence that only one employee knows. The supplier workaround that isn't written down anywhere. The inspection shortcut that saves two hours but lives in someone's head. Connect 981 turns all of it into structured, repeatable workflows that the whole team can run.

Execution owned by aerospace people — not IT backlogs.

Before
Torque seq: 3→1→4→2 NOT 1→2→3→4 John says do corners first or you get micro-cracks
Kit prep notes: - Check P/N 7842 always short - Call Michel for spares (he won't answer Tues) - If gauge reads >4.2 use the old fixture (don't ask why) - Audit trick: pre-fill sheet B before they walk in
John's notes
After
C
Collect Work Order
Auto-assign operator
D
Verify Parts Kit
BOM cross-ref · Flag shortages
Torque Sequence
Enforced: 3→1→4→2
?
Gauge Check
If >4.2 → Alt fixture path
Log Completion
Auto-generate audit record
Knowledge captured in workflow
No dependency on John

results

Deployed in Weeks, Not Years

Connect 981 plugs into your existing systems without disruption. Structured execution and full traceability from day one.

Deployed

across 100+ factories and 350+ suppliers

4 Weeks

average implementation per site

90%

reduction in manual reporting
and errors.

Let's talk

Ready to See How Connect 981 Can Accelerate Your Factory’s Digital Transformation?